C1 Connections: The Innovative Wind Turbine Foundation Interface
Listen now
Description
In this Uptime Spotlight, Joel Saxum discusses the C1 Wedge Connection with Managing Director of C1 Connections, Jasper Winkes. They explore how this innovative wind turbine foundation interface addresses challenges in the expanding offshore wind industry, especially for larger turbines. The design benefits include structural enhancements, faster installation, lower maintenance needs, and possible cost savings for both offshore and onshore wind projects. Sign up now for Uptime Tech News, our weekly email update on all things wind technology. This episode is sponsored by Weather Guard Lightning Tech. Learn more about Weather Guard's StrikeTape Wind Turbine LPS retrofit. Follow the show on Facebook, YouTube, Twitter, Linkedin and visit Weather Guard on the web. And subscribe to Rosemary Barnes' YouTube channel here. Have a question we can answer on the show? Email us! Pardalote Consulting - https://www.pardaloteconsulting.comWeather Guard Lightning Tech - www.weatherguardwind.comIntelstor - https://www.intelstor.com Joel Saxum: I'm Joel Saxum filling in Allen Hall's shoes as your host for this innovation focused guest episode of the Uptime Wind Energy podcast. Today we're talking about wind turbines and massively important connections in between the towers and transition pieces. Bolted L flange have been used for decades to connect steel cylindrical structures. We know this. However, as the wind industry continues to push structural engineering limits with increased capacity for these behemoth wind turbines, specifically offshore, a need for new tech to solve the loading problems has emerged. Enter stage the C1 Wedge Connection. With over seven years of development and two years in the field Jasper Winkes and team have developed the next generation of steel structure connections. Jasper, welcome to the show. Jasper Winkes: Thank you very much for having me. Joel Saxum: Great. So we, you and I talked a little bit off air about kind of the technology where it's been, where it's coming, where it's going, but it's driven by offshore industry trends, right? We've all seen, if you look in the North sea, small turbine big, Bigger, all of a sudden now we're 15 megawatts and some people around the world are talking about what could be the next generation. What are those trends that are driving your technology? Jasper Winkes: Yes, indeed. As you mentioned, we've seen a massive growth in turbine size over the years. And on one hand, that's of course the growth of the rotor. And they always say the rotor is the motor. So you need large rotors to extract energy from the wind. But of course, large rotors also require tall towers. So we see that there's an exponential increase in overturning moments over the past years whereby essentially the bolted L flange...
More Episodes
Allen Hall and Joel Saxum talk with Cory Mittleider from Malloy Wind about the complex world of wind turbine main bearings. Cory breaks down why traditional bearing coatings are failing in newer turbine models and explores how electrical discharge, material choices, and monitoring systems play...
Published 11/21/24
Published 11/21/24
This week on Uptime Power-Up we discuss Vestas' offshore blade repair method, Siemens Gamesa's way of optimizing power production for floating turbines, and a fun way for kid's to collect their Halloween candy. ign up now for Uptime Tech News, our weekly email update on all things wind...
Published 11/20/24