Space Rocket History #243 – Apollo 12 – TLI and the Coast
Listen now
Description
It was impossible to check out the entire spacecraft; that could only be done on the ground. In the short time available, Griffin’s team ran a pre-maneuver check list, re-aligned the CSM platform, and discussed proceeding with the mission with the crew. Homepage with Pics.
More Episodes
Just before the mission began things started to go wrong. The weekend before launch Charlie Duke, the backup lunar module pilot, came down with a case of German measles. Homepage with pictures.
Published 05/29/24
Published 05/29/24
Targeted for touchdown on the third lunar landing was a place known as the Fra Mauro range, a stretch of rugged, Appalachian-type mounds 110 miles east of the Apollo 12 landing site. Homepage with pictures.
Published 05/29/24